Permit glossary
Plain-English definitions of the terms on a permit application, a plan-review letter, or a CO — drawn from our own guides, so the wording matches what you will read elsewhere on this site.
The organization, office, or individual responsible for enforcing a code or standard, or for approving equipment, materials, an installation, or a procedure — in practice, usually the city or county building department that issues your permits and conducts inspections. It can also be a fire marshal or another agency, depending on the project.
Read the full guide →Official written approval from your local building department (the AHJ) to construct, alter, repair, move, or demolish a structure exactly as shown on approved plans. It starts the inspection process that ends, for most projects, with a certificate of occupancy.
Read the full guide →A document issued by your local building department certifying that a building complies with building codes, zoning, and its approved plans, and is safe for its intended use. It is the final sign-off at the end of permitted construction — the building permit lets you build; the CO lets people move in.
Read the full guide →A certificate confirming that a building's existing use may legally continue. It is typically checked when ownership or tenancy changes and no construction is planned. It differs from a standard CO, which is issued after new construction, a change of use, or major permitted work.
Read the full guide →A certificate that lets you occupy part or all of a building for a limited time while minor, non-safety items are finished. It has an expiration date, and if the remaining work isn't completed and the final CO issued before it lapses, occupancy can be revoked.
Read the full guide →A unique number the county tax assessor assigns to every piece of land in their jurisdiction — the property's fingerprint. Every official record about that land is filed under it, and almost every permit application asks for it.
Read the full guide →Official permission to deviate from specific dimensional requirements of the zoning code — setbacks, height limits, lot coverage, parking ratios, sign sizes. It doesn't change what the land can be used for; it changes how the rules apply to a specific property. An area (dimensional) variance deviates from physical requirements; a use variance would change the allowed use.
Read the full guide →The minimum distance a building must sit back from a property line, as required by the zoning code — for example, a 20-foot front setback. Setbacks are one of the dimensional rules a variance can deviate from, and a wrong setback is a common reason a certificate of occupancy gets delayed.
Read the full guide →Permission for a specific use that is listed as conditionally acceptable in a zone — a different use than the zone normally allows, granted after review (often including a public hearing) and subject to conditions.
Read the full guide →A permit for work in public right-of-way — streets, sidewalks, and other public land — such as road construction, utility work, or anything that occupies or alters the public street.
Read the full guide →Changing the zoning designation of a parcel of land itself — a longer, legislative process, distinct from a variance (which bends the dimensional rules for an already-allowed use) or a conditional use permit (which allows a specific conditionally-acceptable use).
Read the full guide →An extension lengthens a permit that is still valid (where the AHJ allows it, sometimes for a fee); reinstatement brings back a permit that has already expired, where the AHJ offers that path. A third path is reapplying for a new permit. Which paths exist, and what they cost, is set by each AHJ.
Read the full guide →Approval for a contractor to do a category of work. A permit approves a specific project at a specific address; a license approves a contractor to do a category of work. Departments check both.
Read the full guide →A visit by the building department (or another AHJ) to verify that work matches the approved plans and code at a required stage — for example, rough, final, electrical, plumbing, or fire finals. Passing the final inspection closes the permit out and, for occupiable buildings, leads to the certificate of occupancy.