Trust & data policy
Permit rules are local, and wrong information is worse than none. This page explains what we verify, what we refuse to guess at, and how you can check — or correct — anything we publish.
We publish a permit validity period, extension rule, processing time, or fee only when we have verified it against an official source. Where we have not verified a rule, we leave the field blank and say so — we never invent a number to fill a page. Every AHJ page that carries verified regulation data shows the source link and the date it was last verified.
Official city and county permit portals (.gov): the building department's own website or online permit system — the primary source for portal links, fee schedules, and application routes in our AHJ directory.
Municipal codes and published rules: the adopted building code and the department's published permit rules (for example, validity and extension provisions cited by section), used for the regulation data on AHJ pages.
State license boards: the official license verification pages linked from our license lookup tool, used to confirm a contractor's license status.
County assessor offices: the official assessor or recorder sites linked from our parcel lookup, used for assessor's parcel number (APN) lookups.
We do not treat another contractor blog, a forum post, or an AI summary as a source for a rule. If a claim can only be traced to one of those, it is not published as verified data.
The AHJ directory itself — 186 official permit portals across all 50 states — is a link directory: each entry is an official portal link with a phone number and notes where available, and each entry carries a “last verified” date.
Detailed regulation data (validity periods, extension rules and fees, processing times) is published only for a 20-metro pilot set of cities, where each figure is tied to a cited official source. The other AHJ pages carry the portal link only, and are marked as such — they are not indexed by search engines until regulation data is added.
Blog guides cite the same discipline: figures in the expiry and validity guides come from the verified 20-metro set, and anything unverified is labelled “varies — not verified.”
Rules change, portals move, and departments reorganise. If a portal link is dead, a fee has changed, or a validity rule on one of our pages is wrong, email [email protected] with the city, what changed, and a link to the official source if you have one. We verify against the official source before updating — we do not take a correction on trust alone, either.
Browse the directory: AHJ permit portals →
Permit Warden tracks every permit, inspection, and renewal across your projects — with automatic reminders before anything lapses.
Start tracking permits free